Since closing our 2021 sailing season, Bessie Ellen has been hauled out at our regular shipyard in Polruan where Colin spent two weeks caulking her up. Meanwhile the crew chipped, scraped and painted everything we could find from water tanks to topsides. With the warm October weather we achieved loads including de-rigging ready for the winter.
Today Bessie Ellen is berthed at the Working Sail shipyard in Truro for a new mainmast plus other ongoing work to keep her in good shape. Over the summer, Clyde and Sam shaped the mast from a Douglas fir cut from the Gunnislake woodlands on the Cornwall Devon border. Sam has also made up new iron work for the throat crane and peak bolts. After galvanising next week work will continue on the mast so we can get in set up by end January. New topmast rigging is being made by T Nielsen and Co in Gloucester with smaller wire work being carried out here by Nikki and crew. The aft cabin and steering box are getting a re-design and makeover after rot was found in coaming joints and plank ends, the idea is to make longitudinal boards cladding the cabin rather than the t&g as the water seems to progress up the end grain and building rot.
In the yard, Ned, Taylor and Tom are busy restoring the brightwork on the spars, dodging showers and working fast as a team they are getting on pretty well. AS the mast is out, all the deadeyes are removed and new bolts ordered, rigging is serviceded where necessary and generally given a good overhaul.
Bracken is chasing seagulls as usual and wishing we all had more time for him to chase squirrels. Such is the life of a sea dog.
